Kitchen remodel
Cabinets, counters, backsplash, sink and faucet, flooring, lighting, and the electrical and plumbing behind them brought to current code.
Here's the actual scope and timeline for each kind of project we run in Tampa Bay. Every project is priced after a free walkthrough.
Priced after a free walkthrough β your written estimate is the real number.
Cabinets, counters, backsplash, sink and faucet, flooring, lighting, and the electrical and plumbing behind them brought to current code.
Full gut and rebuild, or a tub-to-shower conversion. Proper waterproofing behind the tile, corrected venting, new vanity, fixtures, and lighting.
Countertops in marble, granite, quartzite, or engineered quartz. Supply-only if you already have a contractor. Material options here.
Whole-house LVP, tile, or engineered hardwood β including the subfloor repair and levelling that most quotes leave out until the old floor comes up.
Paint throughout, drywall and texture repair, popcorn ceiling removal, new trim and doors, and updated lighting. The highest return per dollar before a sale.
Shingle or flat, tear-off to deck, with the sheathing and fascia repair found underneath. In Florida this is the item your insurer cares about most.
Exterior paint, stucco and siding repair, soffit and fascia, pressure washing, driveway, fencing, and landscaping cleanup.
Travertine or paver decking, resurfacing, and drainage correction. Stone that stays cool underfoot matters more here than anywhere else.
Between tenants, on a deadline. Paint, flooring, appliance swaps, hardware, and the deferred maintenance list β scheduled tight, because a vacant unit costs you every week.
Vacant, inherited, or long-neglected houses taken back to move-in ready: roof, re-pipe, panel upgrade, HVAC, drywall, and every finish. Our own rehabs run exactly this scope.
The short list of work that actually moves your sale price, chosen against what it returns. We'll tell you which items to skip β that advice is free either way.
Curbless showers, grab bars into blocking rather than drywall, widened doorways, ramps, and lever hardware. Done so it looks like design, not like equipment.
Want to talk through a project like yours? Call and we'll walk you through scope and timing.
A whole-house project runs in this order. A single-room job is the same discipline on a smaller scope.
Walk the house, test what's hidden, and write the work down. Roof age, panel capacity, plumbing material, moisture, and structure come first β the expensive surprises all live there.
Contents removed, failed finishes torn out, and the house opened up so the real conditions are visible before a dollar goes into anything cosmetic.
Roof, windows, electrical, plumbing, and HVAC. The part buyers and insurers care about most and photograph least.
Framing corrections, subfloor repair, insulation, drywall, and texture. Where a job either ends up square and flat or doesn't.
Flooring, cabinets, counters, tile, trim, doors, paint, fixtures, and lighting. The visible part β and the fastest part, if the four stages before it were done properly.
A final walkthrough with the owner, and the punch list closed out before the last payment is due.
Finished-kitchen photos are the easiest thing in this industry to fake or borrow. When you're comparing bids β ours included β ask for these instead:
Ask any contractor for all three before you hire.
Free written estimate, no obligation, anywhere in Tampa Bay.